50 Specialist Calculators
Instant Results - No Sign-Up
Free to Use
Professional tools for serious builders

Concrete Screed Calculator

Add each area, choose your screed type and thickness, and get volumes, materials and drying times

Metric (m) Imperial (ft / in)

Areas

Unbonded on insulation: 65-75mm • Bonded to concrete: 25-40mm • UFH: min 65mm over pipes
5%
Allow 5-10% for uneven sub-floors and mixing losses

Job Costing

Enter costs in your local currency.

Results

Total Area
-
Screed Volume
-
Cement Bags
-
x 25kg bags
Sand
-
tonnes

Estimated Drying / Curing Times

-
Walk on
-
Light use / tiling
-
Full cure / floor covering

Drying times are estimates only and depend on temperature, humidity and ventilation. Always check with your screed supplier.

Area Breakdown

Area Floor Area Volume Cement Bags Sand (t)