50 Specialist Calculators
Instant Results - No Sign-Up
Free to Use
Professional tools for serious builders

Flashing Calculator

Add each flashing location - step, apron, valley, abutment, back gutter, ridge. Mix materials across sections.

10%
10% for straightforward work; 15-20% for complex chimneys with many cuts

Flashing Sections

Job Costing (optional)

Lead price fluctuates - check current rate
Total labour - flashing is usually quoted as a job

Results

Total Flashing Area
-
m² (inc. waste)
Total Linear Metres
-
lm (inc. waste)

Section Breakdown

Section Type Material Length Width/Girth Area Lead Weight